ADNOC Gas Processing
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
-
Reserves and resources
- Gas & NGLs
-
Production
- Sales gas
- Ethane
- NGLs
- Sulphur
-
Development
- Plants
- Asab 0&3 Plant (AGP JV)
- Bu Hasa Plant (AGP JV)
- Bab plant (AGP JV)
- Habshan 0-4 (AGP ASR)
- Habshan 5 (AGP ASR)
- Asab 1&2 Plant (AGP ASR)
- Ruwais NGL Fractionation Plant (AGP ASR)
-
Infrastructure
- Gas & NGLs
- Sulphur
-
Costs
- Capital costs
- Operating costs
-
Sales contracts
- Gas
- Ethane
- NGLs
- Fiscal and regulatory
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Key facts: Table 1Index MapDetail Map
-
Participation: Table 1Reserves and resources: Table 1Reserves and resources: Table 2Production: Table 1Production: Table 2Production Profile (IOC assets)Production Profile (NOC assets)Infrastructure: Table 1Costs: Table 1
- 18 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Abu Dhabi FSRU - LNG regas terminal
Abu Dhabi's first LNG import terminal - Express FSRU with 500 mmcfd capacity, operational since 2016, owned by ADNOC Gas Processing.
$1,200Block 09-1 (Bach Ho/Rong)
The Bach Ho and Rong fields are located in the Cuu Long Basin and are operated by the Vietnamese/Russian joint venture Vietsovpetro.
$3,100Ghasha Contract Area
The Ghasha concession contains nine undeveloped gas fields located in shallow waters offshore Abu Dhabi. The fields were discovered ...
$3,100