Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Sumitomo Hyuga nickel operation
All three of Japan's ferronickel plants have received government protection in the form of a 5.85% tariff on the FOB price of FeNi imported from de...
Taifeng zinc smelter
The Taifeng smelter was commissioned in 2002 with a capacity of 45kt/a. In 2008, construction began on a 60kt/a expansion of the smelter to raise t...
Taishet aluminium smelter
Taishet will be configured in two lines, both with two rooms containing 176 cells per room (a total of 704 cells), and will utilise RA-400 technolo...
Tallering Peak iron ore mine
Mining at Tallering Peak ceased in 2014 when the reserve was exhausted. Tallering Peak was a conventional open cut iron ore mine located 172 kilome...
Tamarack nickel project
The Tamarack Project, located in Minnesota, USA, comprises the Tamarack North Project and the Tamarack South Project. A preliminary economic assess...
Tambo Grande gold mine project
The project has been abandoned since 2004 and no mining activity is allowed in the area. The character of the accompanying analysis is just specula...
Viewing page 303 of 423